英语翻译5.1.7 LabellingEach individual hydrant and valve shall i

来源:学生作业帮 编辑:拍题作业网作业帮 分类:综合作业 时间:2024/05/22 20:46:35
英语翻译
5.1.7 Labelling
Each individual hydrant and valve shall incorporate a label to designate its function.The
label shall also incorporate a reference number for the purposes of operational
usage/maintenance.
The labels shall be manufactured from engraved stainless steel / traffolyte or similar
material (impact & corrosion resistant).
5.1.8 Flushing of Pipe work System
All seawater fire fighting pipe work shall be flushed and cleaned out on completion of
and before testing and commissioning.A minimum of two days notice shall be given to
the Engineer prior to this operation.
The water used for flushing shall be disposed of as directed by the Engineer.
During pipework construction all pipework shall have removable temporary seals to
prevent ingress of dirt or other foreign bodies.
To assist in removal of obstructions “pull through” devices shall be utilised,and shall be
pulled through each consecutive pipe installed remaining always in the last section of
installed pipe.
After the valve connections have been made and before the mains are permanently
filled with water,all parts of the system shall be completely and carefully flushed out
using a foam plastic pig forced through the line by water pressure.A certificate of
completion will not be issued until the Engineer is satisfied that all foreign matter,dirt
etc.is removed from the pipelines.At the Engineers direction,parts of the pipeline may
be flushed in stages.
The new potable water pipework (and the existing 25mm pipework) shall be isolated
from the existing system for the purposes of sterilisation.The pipework system shall be
disinfected generally in accordance with BS6700.
5.1.7标签
每一个人的消防栓和阀门应纳入一个标签,指定其功能.那个
标签也应纳入参考号码为目的的业务
使用/维修.
标签上应刻有制造不锈钢/ traffolyte或类似
材料(影响及耐腐蚀) .
5.1.8冲厕管工作体系
所有海水灭火管工作应冲洗和清理,列于完成
和之前的测试和调试.最低二天公告,应当给予
工程师在此之前的运作.
所用的水冲厕,应予以处置的指示,由工程师.
在管道建设的所有管道应具有可移动的临时封条,以
防止渗入泥土或其他异物.
,以协助清除障碍物“渡过难关”的装置,应利用,并应
转危为安,每一个连续的管道安装,其余总是在最后一节
安装管道.
后阀的连接已经作出之前,水管永久
灌满水,各部分系统应完全并仔细冲洗出来
使用发泡胶猪被迫通过线由水压力.证书
完成将不会获发,直到工程师是满意的,所有外国的事,污垢
等是从管道.在工程师的方向,部分的管道可能
在刷新阶段.
新的食水管道(与现有的二五毫米管道)应被孤立
从现行制度为目的的消毒.管道系统应
消毒一般在按照bs6700